133 Plastic End Cap - All - Handrail tubes and tube clamps - Handrail Systems
133 Plastic End Cap
Delivery Information
Order online for delivery to Mainland UK VAT eligible locations only. Delivery charges will be shown in the shopping cart. Despatch dates for products can vary, if urgent, please contact us. Request a quote for postcodes DD, IV, KW, PA, AB, BT, HS, TR. PO30-PO42, southern Ireland, Channel Islands. For international destinations restrictions may apply.
Returns Policy
Simply email us at sales@dale-lifting.co.uk or call 0161 223 1990 and we will be able to give you a returns authorisation code, which must be sent with the returned item. Returns should be authorised within 14 days from the day of delivery to you. Items should be returned in unused condition & due to the nature of our products a restocking fee may apply. Unfortunately, delivery charges are not refundable. Items returned without an authorisation code may not be accepted. Normally All refunds will be processed within 7- 10 working days on receipt of returned goods.
Non-standard (Quote only, pre-order or custom-made products)
Custom made to order products are not covered by our returns policy. Please ensure when ordering all measurements and capacities are correct as we are unable to refund on these products.
For more information see https://www.dlhonline.co.uk/terms-conditions
133 - Plastic End Cap
Grey plastic stop end. Only suitable for tubes with similar dimensions to BS EN 10255 (formerly BS 1387) medium weight. Type 333 is an alternative in metal.
Size | Weight (kg) | Box Qty* | Part No |
A27 | 0.01 | 100 | 133-A27 |
B34 | 0.01 | 100 | 133-B34 |
C42 | 0.01 | 50 | 133-C42 |
D48 | 0.01 | 40 | 133-D48 |
E60 | 0.02 | 25 | 133-E60 |
* Fittings are sold individually and do not need to be bought in box quantities. Box quantities may be subject to change without prior notice.
Figures are given as guidance only; dimensions and weights are subject to manufacturing tolerances and may be altered without prior notice.
Do not perform any pre-drilling, tube cutting, casting uprights or any other dimensionally critical processes prior to receiving fittings.